INSTALLATION WORKS FOR THE PROJECT: "OFFICE BUILDINGS – THE MARK 3 Basements + Ground Floor + 6 Floors AND 3 Basements + Ground Floor+15 Floors" – BUCHAREST
Characteristics:
Design coordination
Turnkey HVAC and sanitation works, including fit-out
Delivery of main equipment:
✓ 2 Boilers x 650 kW ✓ 2 Boilers x 850 kW
✓ 6 Chillers x 640 kW ✓ 6 Cooling Towers
✓ 2 Dry-Coolers, ✓ 13 AHUs ✓ Pumps ✓ Heating and Cooling Automation, etc.
Commissioning and testing, including post-sale and operational support
INSTALLATION WORKS FOR THE PROJECT: "ANA TOWER OFFICES BUILDING 3 Basements + Ground Floor + 25 Floors" – BUCHAREST
Characteristics:
Design optimization
Turnkey HVAC and sanitation works, including fit-out
Main equipment delivered:
✓ 3 Chillers x 1212 kW ✓ 3 Cooling Towers ✓ 1 x Dry-cooler x 700 kW
✓ 3 Boilers x 1100 kW ✓ 60 AHUs
✓ over 1400 Fan Coil Units ✓ Pumps ✓ Heating and Cooling Automation, etc.
Commissioning and testing, including post-sale and operational support
INSTALLATION WORKS FOR THE PROJECT: "AWINTA OFFICE BUILDING" - BRAŞOV
Characteristics:
External installation works of domestic water and rainwater sewer networks, fire hydrant network
Heating, ventilation, air conditioning (HVAC) and sanitary installation works
Medium and low voltage electrical installation works
Fire detection installation, automations
Commissioning and provision of maintenance services during the warranty period